HEC-RAS Output Documentation for LOMR Packages

Proper HEC-RAS documentation proves LOMR packages meet FEMA requirements.

· 8 min read
Cover illustration for “HEC-RAS Output Documentation for LOMR Packages”
HEC-RAS Modeling · October 31, 2026 · 8 min read · 1,838 words

HEC-RAS output documentation for LOMR packages is a demonstration of compliance. An approvable package connects the applicable plan conditions, documented profile tolerances, floodway evidence, and complete digital model. Automated assembly can reduce transcription errors across those deliverables, but the licensed engineer remains responsible for their technical adequacy.

What a LOMR package actually requires from HEC-RAS

A package missing a required plan condition or profile will draw a deficiency comment regardless of the technical quality of the underlying hydraulics. The model alone is not the submission. FEMA requires a set of model conditions with outputs that show the effective baseline, explain corrections, and show how the proposed project changes it. Each applicable condition belongs in a single HEC-RAS project, with its own plan and all effective profiles rather than only the profiles associated with the revised reach.

The FEMA MT-2 form requires hydrologic computations and digital files of computer models, including the names of the plans used when HEC-RAS models are submitted. The documentation therefore has to identify which plan supports each comparison, table, and exhibit. A reviewer should not have to infer that relationship from similar results or from the order in which files appear.

Floodway changes add a separate regulatory obligation. Floodway revisions in a LOMR or CLOMR submittal must comply with NFIP regulations under 44 CFR Section 65.7. A package that fully documents revised water surface elevations may therefore still need more evidence to support a floodway revision. The documentary burden depends on what is being revised, as well as which model conditions apply.

The four plan conditions and what each one must contain

Not every submittal requires all four, but every applicable condition must remain distinguishable within the project. The MT-2 instructions identify the Duplicate Effective Model, if available, and the Revised or Post-Project Conditions Model as the minimum models for LOMRs. The Corrected Effective and Pre-Project conditions supply additional comparisons where required, rather than functioning as interchangeable names for the baseline.

The Duplicate Effective plan reproduces the existing effective model output and establishes the reference for subsequent comparisons. A model developed on the same platform must match the effective output or profile within 0.1 feet. When converting from HEC-2 to HEC-RAS, the accepted tolerance widens to 0.5 feet because of platform differences.

The Corrected Effective plan incorporates geometry corrections without including the proposed project. This separates corrections to the baseline from changes attributable to the improvement. The Pre-Project Condition shows current existing conditions without that improvement and is the comparison baseline for judging the project’s effects. Where both conditions apply, the narrative and outputs must make clear what each one does.

The Post-Project Condition places the proposed improvement in the channel model. It generates the revised BFEs and floodway delineation for FEMA adoption. Like the other applicable plans, it must contain all effective profiles. Its results must be compared with the right preceding condition to show what the final run means.

Calibration tolerances and how to document compliance with them

Achieving a profile match inside HEC-RAS does not replace showing that match to the reviewer. The standard way to show the match is a table that compares effective and Duplicate Effective water surface elevations cross-section-by-cross-section. For each effective profile, the table presents the cross-section identifier, effective elevation, duplicate elevation, and difference so that the applicable tolerance can be assessed directly.

For a same-platform Duplicate Effective model, that comparison must show the 0.1-foot match. The narrative identifies the model condition being compared and explains the basis for applying that tolerance. A statement that the model “matches” cannot do the work of the table because it does not reveal where differences occur. The numerical comparison supplies the evidence, while the narrative establishes how to interpret it.

A HEC-2-to-HEC-RAS conversion requires a different explanation. The 0.5-foot tolerance applies specifically to that conversion. The narrative that goes with it explains how the model was converted and shows which cross sections fall within tolerance. It also explains why results approaching the limit are acceptable in the context of the conversion.

Geometry corrections require their own account rather than being absorbed into the calibration discussion. Where the Corrected Effective plan diverges from the Duplicate Effective plan, the documentation must identify and justify the corrections responsible for those differences. Otherwise, the reviewer cannot distinguish a deliberate correction from an unexplained failure to reproduce the effective model.

Floodway encroachment documentation, iterations, surcharge tables, and plotted profiles

FEMA defines the regulatory floodway as the channel and adjacent land areas that must be reserved to discharge the base flood without cumulatively increasing water surface elevation more than a specified amount. The maximum allowable surcharge is 1.0 foot. A floodway revision must therefore demonstrate more than a change in the computed profile. It must show, cross-section by cross-section, that the proposed encroachment remains within that limit.

The surcharge table is the evidentiary record for that determination. It lists the water surface elevation difference between the floodway profile and the flood profile at each cross section. This is not optional formatting around an otherwise complete model. Without an explicit comparison, the submission leaves the reviewer to reconstruct the regulatory test from underlying results.

Encroachment iteration records explain how the floodway boundary was developed. They serve a different purpose from the surcharge table, which documents the resulting elevation differences. Plotted profiles must also show the floodway and flood profiles on the same exhibit.

HEC-RAS generates the underlying numbers, but assembling raw tabular output into formatted surcharge tables and exhibit-ready plots is currently performed almost entirely by hand. The extra burden is the work of translating model results into the specific records FEMA uses to evaluate the encroachment.

Digital file submission requirements and how files must be organized

Even a technically correct model can draw deficiency comments if its file structure or plan names keep reviewers from checking it on their own. FEMA reviewers must be able to open, navigate, and verify the submitted model. The digital submission therefore consists of the full HEC-RAS project. Supporting documents make the results readable, but they do not replace access to the calculations that produced them.

Splitting them across separate projects or archives breaks the required organization of the submission. Within the project, plan names must be clear and consistent with the narrative. Names such as “Plan 1” or “Option A” create ambiguity because they do not identify the model condition or its role in the comparison.

The same relationship extends to supporting outputs. Profile tables, encroachment tables, cross-section plots, and flood profile exhibits must be sent with the digital model. Their identification must agree with the plan names used in the narrative so that the reviewer can connect an exhibit to the correct condition. The package is navigable when the model and its documentation use the same terms.

FEMA’s RASPLOT program establishes a precedent for automated output extraction. It was developed to extract data automatically from HEC-RAS and HEC-2 files to create flood profiles. That precedent supports automation as a means of preparing regulatory deliverables, rather than treating manual copying as a condition of acceptability.

Which version of HEC-RAS is appropriate for LOMR submittals right now

The appropriate choice for LOMR work is the current production-stable HEC-RAS 7.0.x. The version decision affects the model that FEMA will review. A beta intended for exploring future capabilities is not a substitute for a production release in a regulatory submittal.

FEMA’s accepted model list is identified in the supplied context as recognizing HEC-RAS 7.0 and above starting April 2026. That acceptance date depends on the agency’s guidance, which it updates from time to time. The practical instruction is to confirm the intended production version against FEMA’s current MT-2 guidance at project start.

HEC-RAS 2025 remains relevant to future documentation workflows. Its public C# API exposes a selected, documented subset of the internal API for programmatic model creation, simulation execution, and result extraction. Those tools could link modeling more closely with the work of preparing documents. They do not make the beta appropriate for current production submittals.

Automated extraction and report assembly are already available, so documentation can be automated without adopting the beta. The version choice establishes the production model environment within which those tools must work.

Where manual transcription creates deficiency risk and how automated output assembly addresses it

Profile comparison tables, surcharge tables, encroachment records, plotted profiles, and MT-2 narratives draw from the same underlying model results. Each shows those results for a different purpose. Reformatting them separately creates repeated opportunities for an elevation, profile ordinate, or encroachment station to be copied incorrectly.

A single transposed elevation can trigger a deficiency comment on the profile comparison. The engineer may have modeled the condition correctly even though the evidence appears to disagree. This is a structural weakness in the assembly process. Checking the model alone will not resolve an error introduced later in Word or Excel.

Automated output assembly addresses that handoff directly. GeoHECRAS, for example, offers automated engineering report creation and automated FEMA floodplain encroachment documentation from hydraulic models, designed to eliminate manual copying of results. The relevant principle is the direct use of model output in preparing the deliverable. Automation can reduce the number of transfers in which a correct result becomes an incorrect entry.

AI-assisted document automation fits the parts of that work that involve many outputs in a set format and need little engineering judgment. Its appropriate role is preparing candidate tables and narratives from the model results, with judgments about whether a geometry correction or encroachment is defensible reserved for the licensed engineer. That boundary also shapes adoption. An approach that operates within a firm’s existing HEC-RAS, Civil 3D, and Microsoft 365 environment fits regulated practice more readily than a standalone platform that requires a separate working environment.

The licensed engineer’s role in an automated documentation workflow

Every output in a LOMR submittal remains subject to professional review and stamping. The distinction is between preparing a draft and accepting its engineering content. A table assembled automatically requires review against the model just as a table assembled manually does.

The strongest objection to AI-assisted documentation is that an incorrect statement could survive review. That risk deserves a direct response. An error made by a junior engineer copying results by hand can also pass through undetected. The useful comparison is therefore which process produces fewer errors and makes the remaining errors easier for the PE to identify, rather than whether either process can be assumed error-free.

Well-designed automation produces candidate outputs for the PE to check against the model as a required part of the workflow. The engineer’s attention remains on whether the profile comparison demonstrates the applicable tolerance, whether geometry corrections are justified, and whether the encroachment evidence supports the proposed floodway.

The practical reallocation is specific. Automation handles the transcription and assembly of surcharge tables, profile comparisons, and draft MT-2 narratives. The PE checks calibration, judges encroachment, and makes the engineering decisions behind the submission. FEMA receives a cleaner, more complete package because document production supports professional review rather than competing with it for the engineer’s time.