Comparison
LOMA vs LOMR: Removing One Property or Revising the Flood Map
A LOMA says one property or building was never really in the mapped floodplain, because its natural ground sits at or above the base flood elevation. A LOMR changes the flood hazard information itself. Which one a request needs depends on whether the map or the ground is what changed.
By Floodway Field GuideUpdated Floodplain Studies
At a glance
| Question | LOMA | LOMR |
|---|---|---|
| Full name | Letter of Map Amendment | Letter of Map Revision |
| What it does | Amends the effective map by letter to state that a specific, legally described property or structure is not in the Special Flood Hazard Area (SFHA). The flood elevations and boundaries along the stream stay as they are. | Revises the flood hazard information on the effective FIRM, and the Flood Insurance Study report where needed: base flood elevations (BFEs), the floodway or the SFHA boundary along a reach. |
| Scale | One property: a lot, part of a lot, a single structure, or several lots or structures named in one request. | A reach of stream or an area of the map, often covering many properties at once. |
| What it rests on | Natural ground, not raised by fill, where the lowest ground of the parcel or the lowest adjacent grade of the structure is at or above the BFE. The map was drawn at a scale that could not show it. | A physical change (a channel, bridge, culvert, levee or large-scale fill), or new and better hydrology, hydraulics or topography showing the effective map is wrong. |
| What FEMA compares | Certified elevations of the lot or the structure's lowest adjacent grade against the BFE at that location. | Revised hydrologic and hydraulic models against the effective model, with a certified work map of the new boundaries. |
| Forms | MT-EZ for a single residential lot or structure on natural ground; MT-1 for other requests. Online through FEMA's Online LOMC tool, or by mail. | MT-2 forms, online or by mail. |
| Who certifies and signs | A licensed land surveyor or registered professional engineer certifies the elevations, usually on an elevation certificate or the form's elevation section. No community signature is required. | A registered professional engineer certifies the analysis, and the community official signs the concurrence on MT-2 Form 1. |
| Regulation | 44 CFR Part 70 (Procedure for Map Correction). | 44 CFR Part 65, including 65.6 for BFE changes and 65.7 for floodway changes. |
| Review fee | FEMA does not charge one for a LOMA. Confirm on FEMA's Flood Map-Related Fees page. | Yes, with exemptions. See FEMA's Flood Map-Related Fees page. |
| Takes effect | On the date of the determination letter. | On the effective date stated in the letter. Where BFEs change, after notice and a statutory 90-day appeal period. |
The short answer
A LOMA corrects the map for one property. FEMA flood maps are drawn at a scale that cannot pick out every knoll and building pad, so a lot or house on ground that is naturally at or above the base flood elevation can end up inside the mapped Special Flood Hazard Area. A LOMA, under 44 CFR Part 70, is FEMA's letter saying that property or structure is out. Nothing about the flood itself changes.
A LOMR changes the flood hazard information: the BFEs, the floodway or the floodplain boundary along a reach. It follows a project that changed how the stream floods, or a study that models it better, and it moves the lines for every property along that reach. It rests on a hydraulic model, not a single survey shot.
The quick test: if the question is "is this building above the flood?" with the flood elevation taken as given, the answer is a LOMA (or a LOMR-F where the ground was filled). If the question is "is the flood elevation right?", it is a LOMR.
Where LOMR-F fits
A Letter of Map Revision Based on Fill (LOMR-F) sits between the two. Like a LOMA it is about one property and leaves the BFEs alone; like a LOMR it is a revision, because the ground was changed. Under 44 CFR 65.5 it removes a parcel or structure that was raised to or above the BFE by placing engineered earthen fill. What sets it apart from a LOMA:
- The community has to sign off. The participating community gives written assurance that it has met the minimum floodplain management requirements of 44 CFR 60.3: that the land and structures are reasonably safe from flooding, that it issued permits for the development, and that all other required permits were obtained (44 CFR 65.5(a)(4)).
- Not in floodways or V zones. 44 CFR 65.5(a) applies the fill process outside V zones and floodways, and a fill-based revision must show the fill does not encroach on the floodway (65.5(a)(7)). For what the floodway allows, see floodway vs floodplain.
- It carries a review fee, unlike a LOMA; see FEMA's fee page.
- A CLOMR-F can come first. Before fill is placed, FEMA can comment on whether the proposed fill would meet the standards for removal. Like a CLOMR, a CLOMR-F needs documentation of Endangered Species Act compliance.
Whether ground counts as natural or as fill depends on when the fill was placed relative to the area's mapping, not only on whether it is there. FEMA's MT-1 instructions explain how it dates fill; read them before choosing between a LOMA and a LOMR-F.
Which one a request needs
- A house on a natural rise inside the mapped SFHA, nothing built or filled: LOMA. A surveyor's elevation of the lowest adjacent grade, compared with the BFE, settles it.
- A lot or pad raised with fill to clear the BFE: LOMR-F, with the community's acknowledgment. Planned fill not yet placed: CLOMR-F first if the owner wants FEMA's comment in advance.
- A new subdivision filled above the BFE: LOMR-F, which can cover multiple lots in one request, unless the work also changed the flood elevations along the stream.
- A culvert, bridge or channel project that lowers flood elevations: LOMR, using as-built data, and a CLOMR beforehand if the project raises the BFE. See the CLOMR vs LOMR guide and the culvert replacement LOMR case study.
- The effective BFE itself looks wrong (old hydrology, poor topography, a structure missing from the model): LOMR, built on a corrected effective model.
- Zone A with no BFE on the map: a LOMA is still possible, but a BFE has to be established first. FEMA can develop one for the request, or the requester can supply one from an existing study or an engineering analysis; FEMA's guide to approximate Zone A areas covers the methods.
How a LOMA request works
- Check the effective map. Find the FIRM panel and BFE for the property in FEMA's Flood Map Service Center, and check for pending or preliminary maps that may change it.
- Get certified elevations. A licensed land surveyor or registered professional engineer measures the lowest adjacent grade of the structure (or the lowest ground of the parcel, for a lot removal) on the same vertical datum as the BFE. Follow the form's definition of lowest adjacent grade, since it includes ground next to attached features as well as the walls.
- Compare against the BFE. If the elevation is below the BFE, a LOMA will be denied. Save the request and look at whether the BFE itself is the problem, which is a LOMR question.
- Gather the property records the form asks for, typically the recorded deed or plat with recordation information, or a tax map where no plat exists.
- Submit on MT-EZ or MT-1 through the Online LOMC tool or by mail.
- Answer any data request from FEMA, then receive the determination letter. Keep a copy with the property records and send one to the lender.
What each means for flood insurance
Once a LOMA or LOMR-F removes a structure from the SFHA, the federal mandatory flood insurance purchase requirement no longer applies to it. A lender can still require coverage as a condition of the loan, so the letter has to go to the lender, and the lender decides. A policyholder whose property is removed by a LOMA can cancel within the current policy year and request a premium refund under the conditions of 44 CFR 62.5 (44 CFR 70.8).
A LOMR moves properties both ways. Where it lowers BFEs or narrows the floodplain, buildings can come out of the SFHA; where it raises them, buildings can go in. When BFEs change, FEMA publishes notice of the change before it takes effect, and the letter states the effective date.
What a policy costs depends on the building and its risk, not only on which zone it is in. Ask an insurance agent or the NFIP for a quote rather than assuming what a letter will save.
Mistakes that cost time
- Using the lowest floor instead of the lowest adjacent grade for a LOMA. FEMA's comparison for removing a structure is the ground next to it.
- Mixing vertical datums. An elevation in NAVD 88 compared with a BFE published in NGVD 29, or the reverse, can flip the answer. Use the datum on the FIRM, or document the conversion.
- Filing a LOMA for filled ground. If the lot was raised, the request is a LOMR-F and needs the community's acknowledgment; filing it as a LOMA costs a round trip.
- Expecting a LOMA to fix a wrong BFE. A LOMA takes the effective BFE as given. If the BFE is the problem, the fix is a LOMR with a hydraulic analysis.
- Forgetting the next map update. When a new FIRM becomes effective, earlier letters of map change are either revalidated or superseded. Check the community's revalidation list for the new map, and re-request where a letter was not carried forward.
On the engineering side, a LOMR is a much larger job than a LOMA, with models, work maps and review rounds. For how firms scope and price that work, see how small engineering firms price and scope LOMR projects, and for assembling the model package, the HEC-RAS output documentation guide.
Where to check fees, forms and status
- fees and exemptions for each request type: FEMA's Flood Map-Related Fees page;
- the current MT-EZ and MT-1 forms and instructions: FEMA's LOMA and LOMR-F page;
- MT-2 forms for a LOMR: FEMA's LOMR and CLOMR page;
- the effective map, BFE and any letters already issued for a property: the Flood Map Service Center;
- local requirements, permits for fill and the community acknowledgment for a LOMR-F: the community floodplain administrator.
Questions
What is a LOMA?
A Letter of Map Amendment is FEMA's official determination that a specific property or structure, on natural ground at or above the base flood elevation, is not in the Special Flood Hazard Area even though the flood map shows it inside. It is issued under 44 CFR Part 70 and does not change any flood elevations.
Can a homeowner apply for a LOMA without an engineer?
Yes. A property owner can submit the request. It usually needs elevations certified by a licensed land surveyor or registered professional engineer, often on an elevation certificate; the form's instructions say what a given request needs.
Does a LOMA lower flood insurance?
It removes the federal requirement to buy flood insurance for the structure it covers, though a lender may still require coverage. Whether and how much a policy changes is a question for an insurance agent or the NFIP.
What is the difference between a LOMA and a LOMR-F?
Both remove one property or structure from the Special Flood Hazard Area without changing the BFE. A LOMA is for natural ground; a LOMR-F is for ground raised by fill, needs the community's written acknowledgment under 44 CFR 65.5, cannot be used for fill in a floodway, and carries a review fee.
How long does a LOMA or LOMR take?
It depends on how complete the request is and whether FEMA asks for more data. A LOMR that changes BFEs also waits out the 90-day appeal period before taking effect. Track a submitted case with FEMA's status tool rather than relying on a figure from an old project.
Sources
Regulations and FEMA guidance change. Confirm requirements against the current versions of these sources before relying on them for a submittal.
- FEMA: Letter of Map Amendment and Letter of Map Revision Based on Fill
- FEMA: Letters of Map Revision and Conditional Letters of Map Revision
- FEMA: Flood Map-Related Fees
- 44 CFR Part 70: Procedure for map correction
- 44 CFR 65.5: Revision to special hazard area boundaries with no change to base flood elevation determinations
- FEMA Flood Map Service Center