Comparison
Floodway vs Floodplain: What Each Means on a FEMA Map and What You Can Build
The floodplain is all the land the base flood covers. The regulatory floodway is the strip of it, channel included, that has to stay open so the flood can pass. Which one a site sits in decides what a project has to prove before it is permitted.
By Floodway Field GuideUpdated Floodplain Studies
At a glance
| Question | Regulatory floodway | Floodplain outside the floodway (flood fringe) |
|---|---|---|
| Definition | The channel of a river or other watercourse and the adjacent land areas that must be reserved to discharge the base flood without cumulatively raising the water surface more than a designated height (44 CFR 59.1). | The rest of the Special Flood Hazard Area: land the base flood (1% annual chance, the 100-year flood) inundates but that is not needed to carry it. |
| How it is set | By a hydraulic encroachment analysis: the floodplain is narrowed from both sides until the base flood rises by the allowable surcharge, no more than 1.0 foot at any point under NFIP minimums (44 CFR 60.3(d)(2)). States and communities may allow less. | Whatever lies between the floodway limits and the edge of the base flood. The floodway analysis assumes this land could be filled or blocked completely. |
| On the FIRM | Shown hatched inside Zone AE (or A1–30) along riverine studies with detailed analysis. Floodway widths and surcharges are listed in the Floodway Data Table of the Flood Insurance Study. | Zone AE or A1–30 without hatching, plus Zones A, AH and AO, which normally have no floodway. |
| Development standard (NFIP minimum) | No encroachment (fill, new construction, substantial improvement or other development) unless hydrologic and hydraulic analysis shows it causes no increase in flood levels during the base flood (44 CFR 60.3(d)(3)). In practice: a no-rise certification, or a CLOMR under 60.3(d)(4). | Development is permitted subject to the community's floodplain permit and construction standards, such as the lowest floor of new and substantially improved homes at or above the base flood elevation (44 CFR 60.3(c)(2)). |
| Hydraulic analysis for a project | Required: existing and proposed conditions modeled the same way, with the comparison showing 0.00 foot of rise. | Not required under NFIP minimums where a floodway is adopted. Required where Zone AE has no floodway (the 1.0-foot cumulative test in 60.3(c)(10)), and where state or local rules ask for it. |
| Flood insurance purchase requirement | Applies: the floodway is part of the Special Flood Hazard Area. | Applies: the fringe is part of the Special Flood Hazard Area. |
| How to change it | A floodway revision through a LOMR or CLOMR, meeting 44 CFR 65.7 (public or owner notice, state approval where the state has jurisdiction, and a new encroachment analysis). | A LOMR changes the floodplain boundary along a reach. A LOMA or LOMR-F removes a single property or structure that sits above the base flood elevation. |
The short answer
The floodplain, in FEMA's regulatory sense the Special Flood Hazard Area (SFHA), is all the land with a 1% or greater chance of flooding in any year. The regulatory floodway is part of it: the channel and the nearest overbanks, which carry most of the flow and so have to be kept clear. Every floodway is in the floodplain; most of the floodplain is not floodway. The part outside the floodway is called the flood fringe.
The two are regulated very differently. In the fringe, the National Flood Insurance Program (NFIP) lets a community permit building as long as the building meets elevation and construction standards. In the floodway, any development, including fill, a bridge pier or a parking lot regrade, has to be shown not to raise the base flood elevation (BFE) at all.
For flood insurance, the distinction does not matter: a building with a federally backed mortgage anywhere in the SFHA, floodway or fringe, is subject to the mandatory purchase requirement. It matters for permitting, design and cost.
How the floodway is drawn
A floodway is not a line someone sketched along the bank. It comes out of the Flood Insurance Study's hydraulic model, normally in a run called an encroachment analysis:
- The model computes the base flood water surface with the full floodplain open (the "without floodway" elevation).
- Encroachment stations are moved in from each overbank, removing conveyance, until the water surface rises by the target surcharge. Under 44 CFR 60.3(d)(2) the floodway must carry the base flood without raising it more than 1.0 foot at any point; some states and communities set a smaller allowable rise.
- The resulting "with floodway" elevations, the surcharge at each cross section and the floodway width are published in the Floodway Data Table of the Flood Insurance Study, and the floodway is drawn on the FIRM.
In HEC-RAS 1D steady flow this is done with the encroachment methods in the steady flow analysis: Method 4 (equal conveyance reduction to a target rise) or Method 5 (optimization to a target surcharge) are often used to find the limits, and Method 1 (fixed stations) to set the final, smoothed floodway. Since version 6.4, HEC-RAS 2D also has an encroachment tool; see HEC-RAS 2D vs 1D model selection for FEMA submittals for when that changes the choice of model.
The key consequence: because the analysis assumes the fringe is filled completely, the allowable rise has already been spent on the fringe. That is why fringe development needs no rise analysis once a floodway is adopted, and why the floodway itself is held to zero rise.
FEMA flags negative surcharges and surcharges above 1.00 foot in a floodway analysis as errors to resolve, a check the output documentation guide for LOMR packages covers alongside the surcharge tables.
How to tell which one a site is in
- Find the effective FIRM panel in FEMA's Flood Map Service Center or the National Flood Hazard Layer. Check for pending LOMRs and preliminary maps too: a newer study may move the floodway.
- Look for the hatching. The regulatory floodway is drawn as a hatched area inside Zone AE (or A1–30). Unhatched Zone AE is fringe.
- Check the Floodway Data Table in the Flood Insurance Study report for the floodway width, regulatory, without-floodway and with-floodway elevations and the surcharge at each lettered cross section near the site.
- Zone AE with no hatching on the whole stream may mean no floodway was ever designated, not that the site is in the fringe. The 1.0-foot cumulative test of 44 CFR 60.3(c)(10) applies there instead.
- Zone A (approximate study) has no BFEs or floodway on the map. Under 44 CFR 60.3(b)(4) the community must obtain and reasonably use any BFE and floodway data available from other sources, so ask whether a state or local study exists.
- Ask the community floodplain administrator. The community adopts the floodway into its ordinance and may have adopted a local floodway wider than FEMA's, or regulate additional areas.
Map lines are drawn on the base map of their era. Where the floodway boundary is close to the work, plot the floodway stations from the Floodway Data Table and the model on current survey rather than scaling off the panel.
What it takes to build in the floodway
Under 44 CFR 60.3(d)(3), the community has to prohibit any encroachment in the adopted floodway unless hydrologic and hydraulic analysis, done to standard engineering practice, shows it would not increase flood levels during the base flood. That leaves two routes:
- No-rise certification. A registered professional engineer models existing and proposed conditions, starting from the effective model, and certifies that the project causes no increase (0.00 foot) in the BFE, floodway elevations or floodway width. Most bridge, culvert, utility and trail projects aim for this. See HEC-RAS bridge modeling for no-rise certification.
- A CLOMR first, then a LOMR. Under 44 CFR 60.3(d)(4), a community may permit an encroachment that raises the BFE only after FEMA issues a CLOMR, with the conditions of 44 CFR 65.12 (alternatives analysis, notice to affected owners, no structures in the area the higher BFE reaches). The CLOMR vs LOMR guide covers that process.
Even a project with zero rise can change what the map shows, for example a culvert replacement that lowers flood elevations upstream. That needs a LOMR afterwards, as the culvert replacement LOMR case study walks through.
Many states and communities go further than these minimums: prohibiting new residential structures in the floodway outright, limiting the allowable rise used to set it, or requiring a state permit for any floodway work. Check the local ordinance and the state NFIP coordinator before design is fixed.
What it takes to build in the flood fringe
Outside the floodway but inside the SFHA, NFIP minimum standards treat development as permissible with conditions. The usual ones, under 44 CFR 60.3(c):
- a floodplain development permit from the community for any development, not only buildings;
- the lowest floor of new and substantially improved residential buildings at or above the BFE, and non-residential buildings elevated or dry floodproofed to it;
- an elevation certificate or floodproofing certificate as the record of the as-built elevation;
- flood-resistant materials and anchoring, and utilities protected from flood damage.
Many communities add freeboard (elevating a set height above the BFE), compensatory storage for fill, or a rise analysis even in the fringe. Those are local rules: the community's ordinance and its floodplain administrator are the place to check.
Mistakes that cost time
- Using "floodplain" and "floodway" interchangeably in a scope or a permit application. The analysis a project needs depends on which one it touches.
- Scaling the floodway off a FIRM panel when the work is near the line. Use the model's encroachment stations and current survey.
- Treating temporary works as exempt. Cofferdams, stockpiles and construction access in the floodway are development too; ask the community how it wants them shown.
- Assuming an unhatched Zone AE is fringe on a stream with no designated floodway, where the cumulative 1.0-foot test still applies.
- Changing the model between existing and proposed runs (roughness, coefficients, cross sections away from the site), which produces a rise or fall that has nothing to do with the project.
Questions
Is the floodway the same as the 100-year floodplain?
No. The 100-year floodplain (the Special Flood Hazard Area) is all the land the 1% annual chance flood covers. The regulatory floodway is the part of it, channel included, that has to stay open to carry that flood. The rest is the flood fringe.
Can you build a house in a floodway?
Only if hydraulic analysis shows the house, its fill and everything else built with it would cause no increase in the base flood elevation, or after FEMA issues a CLOMR for the increase. Many states and communities prohibit new residential construction in the floodway outright, so check the local floodplain ordinance first.
What is the flood fringe?
The part of the Special Flood Hazard Area outside the regulatory floodway. The floodway analysis assumes it could be filled entirely, so NFIP minimum standards allow development there under elevation and construction requirements without a rise analysis.
Does being in the floodway change flood insurance?
The mandatory purchase requirement applies across the whole Special Flood Hazard Area, floodway and fringe alike. What a policy costs depends on the building and its flood risk; ask an insurance agent or the NFIP for a quote rather than assuming the floodway changes it.
Can a LOMA take a property out of the floodway?
A LOMA removes a property or structure on natural ground above the base flood elevation from the Special Flood Hazard Area; it does not revise the floodway. Changing the floodway itself takes a floodway revision through a LOMR, under 44 CFR 65.7. See LOMA vs LOMR for which letter a request needs.
Sources
Regulations and FEMA guidance change. Confirm requirements against the current versions of these sources before relying on them for a submittal.
- 44 CFR 59.1: Definitions (regulatory floodway, area of special flood hazard)
- 44 CFR 60.3: Floodplain management criteria for flood-prone areas
- 44 CFR 65.7: Floodway revisions
- 44 CFR 65.12: Revision of flood insurance rate maps to reflect base flood elevations caused by proposed encroachments
- FEMA Flood Map Service Center
- FEMA: Letters of Map Revision and Conditional Letters of Map Revision